fbpx
Los Garifuna se unen contra discriminación
September 12, 2014
Home invasion in San Pedro town terrifies American retirees
September 12, 2014

Repairs made on Haulover Bridge

Haulover Bridge

Posted: Friday, September 12, 2014. 10:04 am CST.

Haulover Bridge construction

Haulover Bridge construction

Friday, September 12, 2014. AARON HUMES Reporting: Between 10:00 Thursday night and 3:00 a.m. this morning, the sole link to destinations north of Belize City was cut off, but it was a needed gesture.

The Haulover Bridge at Mile 5 on the Philip Goldson Highway was closed by the Ministry of Works and Transport for immediate and urgent repairs to key support structures for the bridge.

Haulover Bridge

Haulover Bridge

The actual repairs were conducted between 10:00 p.m. and midnight and the bridge is back to full use as of this morning.

Chief Engineer Lennox Bradley says supports under the concrete slabs on the deck of the bridge were giving way and needed to be welded back in place, but he assures that the bridge is otherwise structurally sound.

Works are soon expected to start on a replacement bridge as part of the Government’s investment in expanding the highway between Belize City and Ladyville to four lanes.

 

Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Belize ~ We offer fully customizable and flexible digital marketing packages. Your content is delivered instantly to thousands of users in Belize and abroad! Contact us at mаrkеtіng@brеаkіngbеlіzеnеwѕ.соm or call us at 501-612-0315.

 

© 2014, BreakingBelizeNews.com. Content is copyrighted and requires written permission for reprinting in online or print media. Theft of content without permission/payment is punishable by law.

Comments

  • Galen University
  • Belmopan Aggregates
  • Belmopan Aggregates
  • larry waight
  • Galen University
  • cahal pech village resort
  • Belmopan Aggregates
  • Belmopan Aggregates