Annual Cancer Walk postponed
March 20, 2020
Belize Tourism Board surveying hoteliers to seek those willing to share facilities as quarantine centers
March 20, 2020

New Roaring Creek bridge opens to traffic

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

Posted: Friday, March 20, 2020. 1:10 pm CST.

The views expressed in this article are those of the writer and not necessarily those of Breaking Belize News.

By Delroy Cuthkelvin: The first vehicle to cross the new Roaring Creek Bridge this morning, as it was opened for the first time to traffic, was driven by Chief Executive Officer in the Ministry of Works, Errol Gentle.

The bridge is built 12 feet above the old one, and has two full lanes for vehicular traffic, as well as two pedestrian paths. Higher, wider and stronger, this new bridge is a landmark that puts an exclamation on twelve years of infrastructure transformation by this UDP Dean Barrow Administration.

It was constructed by M&M Engineering of Belize, under the supervision of IMC Engineering based in the United Kingdom.

 

Аdvеrtіѕе wіth thе most visited news site in Веlіzе ~ Wе оffеr fullу сuѕtоmіzаblе аnd flехіblе dіgіtаl mаrkеtіng расkаgеѕ. Yоur соntеnt іѕ dеlіvеrеd іnѕtаntlу tо thоuѕаndѕ оf uѕеrѕ іn Веlіzе аnd аbrоаd! Соntасt uѕ аt [email protected] оr саll uѕ аt 501-601-0315.

 

© 2020, BreakingBelizeNews.com. This article is the copyrighted property of Breaking Belize News. Written permission must be obtained before reprint in online or print media. REPRINTING CONTENT WITHOUT PERMISSION AND/OR PAYMENT IS THEFT AND PUNISHABLE BY LAW.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *