Posted: Saturday, July 9, 2022. 12:13 pm CST.
Photo Credit: MIDH
By Rubén Morales Iglesias: If you’re driving on the Philip Goldson Highway on Sunday, do exercise caution as long and heavy bridge beams are being transported from Ladyville to Ladyville to the Haulover Bridge.
“The Ministry of Infrastructure Development & Housing (MIDH), through its construction contractor for the Haulover Bridge Replacement Project, M&M Engineering Consultants Ltd., informs the public that six extremely heavy, 100-foot-long bridge beams will be transported along the Philip Goldson Highway from Ladyville to the southern approach of the Haulover Bridge,” said a MIDH press release on Friday.
The Ministry of Infrastructure Development and Housing (MIDH) said the transportation will take place throughout the day on Sunday, July 10, 2022.
The MIDH advises drivers to be vigilant and exercise extreme caution when approaching the heavy equipment transporting these reinforced concrete beams.
“Drivers are asked to always follow traffic warnings and the instructions of escorts as these beams may take up the entire width of the highway and the existing Haulover Bridge,” said the MIDH.
The MIDH said that they thank everyone “for their kind cooperation in abiding by these safety precautions and by exercising due care and attention when encountering these extraordinary loads on the highway”.
Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Belize ~ We offer fully customizable and flexible digital marketing packages. Your content is delivered instantly to thousands of users in Belize and abroad! Contact us at mаrkеtіng@brеаkіngbеlіzеnеwѕ.соm or call us at 501-612-0315.
© 2022, BreakingBelizeNews.com. Content is copyrighted and requires written permission for reprinting in online or print media. Theft of content without permission/payment is punishable by law.
Comments