fbpx
Man allegedly chokes girlfriend in a jealous rage; Charged for assault
September 16, 2022
Belmopan business robbed by a group of armed men
September 16, 2022

Long bridge beams to be transported on Philip Goldson Highway from Sept 18-20th; Public is advised to be vigilant

Posted: Friday, September 16, 2022. 11:40 am CST.

Contributed: The Ministry of Infrastructure Development & Housing, through its construction contractor for the Haulover Bridge Replacement Project, M&M Engineering Consultants Ltd., informs the public that six extremely heavy, 100-foot-long bridge beams will be transported along the Philip Goldson Highway from Ladyville to the southern approach of the Haulover Bridge throughout the day from September 18 to 20, 2022.

The public is advised to be vigilant and exercise extreme caution when approaching the heavy equipment transporting these reinforced concrete beams.

Drivers are asked to always follow traffic warnings and the instructions of escorts as these beams may take up the entire width of the highway and the existing Haulover Bridge.

The ministry thanks the public for their kind cooperation in abiding by these safety precautions and by exercising due care and attention when encountering these extraordinary loads on the highway.

 

Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Belize ~ We offer fully customizable and flexible digital marketing packages. Your content is delivered instantly to thousands of users in Belize and abroad! Contact us at mаrkеtіng@brеаkіngbеlіzеnеwѕ.соm or call us at 501-612-0315.

 

© 2022, BreakingBelizeNews.com. Content is copyrighted and requires written permission for reprinting in online or print media. Theft of content without permission/payment is punishable by law.

Comments

  • Galen University
  • Belmopan Aggregates
  • larry waight
  • Belmopan Aggregates
  • cahal pech village resort
  • Galen University
  • Shindaiwa
  • Belmopan Aggregates