fbpx
Hawkesworth Bridge Closure
April 10, 2024
National Agriculture and Trade Show 2024: Farmer of the Year Winners
April 10, 2024

Iconic Hawkesworth Bridge connecting Twin Towns to be closed from May to November

Posted: Wednesday, April 10, 2024. 1:08 pm CST.

By Aaron Humes: The Ministry of Infrastructure Development & Housing announces that due to critical maintenance and repair needs, the Hawkesworth Bridge connecting San Ignacio with Santa Elena Town will be closed long-term between May 2 and November 2, 2024.

The Ministry says the closure has become necessary to conduct critical maintenance and overdue repairs to structural bridge elements within the deck and walkways, as well as to carry out a thorough routine maintenance and general upliftment of the bridge and its supports.

Motorists are advised to use the Macal Bridge through La Loma Luz Boulevard, Santa Elena, during the closure period. As always, the public is asked to be vigilant and exercise caution while driving, please follow traffic warnings and the instructions of Transport and Police personnel.

The one-lane suspension bridge has been in use since August of 1949.

 

Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Belize ~ We offer fully customizable and flexible digital marketing packages. Your content is delivered instantly to thousands of users in Belize and abroad! Contact us at mаrkеtіng@brеаkіngbеlіzеnеwѕ.соm or call us at 501-612-0315.

 

© 2024, BreakingBelizeNews.com. Content is copyrighted and requires written permission for reprinting in online or print media. Theft of content without permission/payment is punishable by law.

Comments

  • Galen University
  • Belmopan Aggregates
  • larry waight
  • Belmopan Aggregates
  • cahal pech village resort
  • Galen University
  • Belmopan Aggregates
  • Belmopan Aggregates