fbpx
November 15, 2023

UPDATE: Traffic bumper-to-bumper on both major highways due to Haulover Bridge being temporarily out of service

Motorists who want to enter Belize City limits are advised to utilize the John Smith Link Road, and those who are leaving City limits are advised [...]
November 15, 2023

Heavy machinery temporarily blocking Haulover Bridge

Reports from the area say there is heavy machinery stuck on and under the bridge at the moment.
November 10, 2023

Repaving of Corozal Free Zone Access Road to start in December to the tune of $2.98 million

By Rubén Morales Iglesias: Work on rehabilitating the 1.6-kilometre Corozal Free Zone (CFZ) access road, from the Santa Elena Bridge to the CFZ, should be starting in [...]
October 25, 2023

Second Road Safety Project launched in Belize City

The initiative, funded by the Government of Belize in collaboration with the Caribbean Development Bank and executed through the Ministry of Economic Development, signifies a significant [...]
September 19, 2023

Essential road safety tips for Belize’s Independence Day Celebrations

Belize, at 42, has grown immensely in its economic and infrastructure position. The economy continues to develop, and our roads continue to improve; however, one type [...]
September 7, 2023

Baking Pot ferry closed for ongoing works

The team at MIDH is replacing a damaged ferry cable.
August 16, 2023

San Pedranos can name a street in La Isla Bonita

It is also a great way to interact with residents of the island, because when people are included in significant things such as this they feel [...]
August 16, 2023

Inmates clean up Belize’s roads

The Ministry of Infrastructure Development and Housing (MIDH) has started a program that allows inmates from the Belize Central Prison, Hattieville, run by the Kolbe Foundation, [...]